Monday, November 6, 2023

FALL WORK WEEKEND---NOVEMBER 17-19...

 THE WATER IS ON "WINTER OPERATION" NOW AND THE PORCH WINDOWS ARE IN STORM WINDOW MODE.  

THE WORK WILL FOCUS ON THE GROUNDS; LEAF PICK UP,  MAYBE MOWING, REMOVAL OF ALL OF THE WOOD CHIPS FROM TREE CUTTING AND FILLING THE HOLES LEFT WHEN THE TREES FELL.  

WE ALSO WILL PLAN FOR A RAMP REPLACEMENT AND DO SOME WORK TO SHORE UP THE DECK AND STEPS.

WE MAY PUT UP THE 2 SIDING BOARDS ON THE LONG DECK TOO.

THE FLOOD SIGN IS FAILING ON THE OLD STUMP SO IT WILL NEED TO BE MOVED TO THE DECK.

THE LIFE GUARD CHAIR IS TOO ROTTEN FOR CONTINUED USE AND WILL BE REPLACED NEXT YEAR.  WE CAN LET IT ALONE FOR THE WINTER AS IT WILL SERVE AS OUR MODEL FOR THE REBUILD.



No comments:

Post a Comment